Actually done 11/18/14, but just now blogging.
First General Contractor job was to hire the Gas pipe installer. Check!
We wanted the gas pipe to come in from behind the drywall so we wouldn't have a pipe sticking out, but the builder of this house put the drywall really close to the foundation so there was not enough room for the pipe. The drill fit fine, but the pipe wouldn't.
 |
| Waiting for the inspector to sign us off. |
No comments:
Post a Comment